all national sources in one radar picture
of the naval situation in the Adriatic Sea
in addition to the capability of sharing
information with NATO; (2) In the period
from 2015 - 2018 to achieve the capability of anti-mine operations by procurement of two mine hunters and their
equipping and modernization by the end
of 2020.
At the end of the planning period, the
project of multi-role patrol boat will begin; it will be designed to carry out a variety of tasks, i.e., to have the capability of
combating surface targets and elements
of anti-submarine combat.,
Depending on the analysis of the security
environment, the Navy will be equipped
Overview of the Projects of Equipping and Modernization Projects of the Croatian Navy
PLANNING PERIOD
PRIORITY LEVEL
By the end of 2017
Equipping of the Coast Guard
with five coastal patrol boats.
I.
By the end of 2020
Complete equipping and phasing into operational use of the
coastal patrol boats.
Modernization of the Radar
System “Enhanced Peregrine”,
integration of the maritime
surveillance sensor data into a
single network and reaching the
capability of sharing data and
radar picture with NATO.
Equipping with two Autonomous
Underwater Vehicles (AUVs)
aimed at developing mine countermeasures (MCM) capabilities
in shallow sea.
To begin equipping with two Mine To complete equipping and
hunters.
phasing into operational use
two Mine hunters.
T H E C R O AT I A N A R M E D F O R C E S L O N G − T E R M D E V E L O P M E N T P L A N 2 0 1 5 − 2 0 2 4
By the end of 2024
Equipping with used off-shore
patrol vessel (OPV).
To begin equipping with new
anti-mine missiles.