2014 2024 Figure 14: The costs of personnel, operational costs and equipping and construction costs ratio in 2014. Figure 15: The costs of personnel, operational costs and equipping and construction costs ratio in 2024. bat aircraft capabilities will be adopted by the end of 2016. The complexity of this capability, or the time required to introduce the new aircraft, as well as calculations based on the ten years of investment, indicate that there is a need for such a process, which will begin in 2019 and the continued investment in the next planning period. Consequently, this decision will affect the sheer size of the Defense Budget in 2019. Projected total Defense Budget in the ten-year period covered by this Plan is increased, depending on the variants of the financing capability of combat aircraft in amount varying between 2.4 and 4.2 billion HRK. Figure 13 shows projections of the Defense Budget with three versions of its growth from the year 2019. In addition to the basic version that implies around LEGEND: Operation costs Equipping and construction Salary Other expenses related to personnel Costs of international missions and operations 95

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents