Core Elements Comprising Defense Capability, etc.
Part 4
Fig. IV-2-3-1
Equipment for Project Management and Equipment for Semi-Project Management
Procurement program of the
project management focused
equipment , etc. (2017)
Procurement program of the project
management focused equipment, etc. (2019)
Procurement program of the project management focused equipment, etc. (2018)
Land-based Aegis system
(Aegis Ashore)
FY2017 Submarine
Type-16 mobile combat vehicles
Aerial refueling/transport aircraft
(KC-46A)
Airborne early warning aircraft
(E-2D)
Hyper Velocity Gliding Projectile
Procurement program of the project management focused equipment, etc. (2015)
SM-3 Block IIA
Type-03 medium-range surface-to-air missile
(Improved)
Unmanned aerial vehicle
(RQ-4B Global Hawk)
Amphibious vehicle
(AAV7)
New destroyer
New multipurpose helicopter
(GSDF UH-X)
Tilt-rotor aircraft
(V-22)
New patrol helicopter
(SH-60K upgraded capability)
Fixed wing patrol aircraft (P-1)
Transport aircraft (C-2)
Fighter aircraft (F-35A)
Future Fighter Aircraft
Chapter
2
Measures on Defense Equipment and Technology
Equipment for Semi-Project Management, etc. (2017)
New ship-to-air missile
Type-12 surface-to-ship guided
missiles (Advanced)
New air-to-ship guided missiles
for reconnaissance aircraft
Equipment for Semi-Project Management, etc. (2019)
Space Situational Awareness
(SSA) System
(2) Future Initiatives
In order to further promote effective and efficient equipment
acquisition, the MOD needs to enhance the effectiveness and
flexibility of project management throughout equipment life
cycles. To this end, under the MTDP, the MOD/SDF will
take new initiatives, including undertakings that contribute
to cost reduction at mass production stage as a requirement
at the development stage, incorporating successful examples
in the civilian sector into the manufacture of defense
equipment, and actively adopting the competitive bidding
❷
For the purpose of promoting acquisition reform, which is a
prompt response to swiftly changing surroundings, the MOD has
been holding meetings of the Comprehensive Acquisition Reform
Committee since 2007, in addition to the Contractual Systems
Study Groups held since 2010 to review acquisition systems.
Since FY2016, a special research officer system3 has been adopted
in order to surely bring the review results to fruition.
4
431
UUV with convertible
mission module
Hypersonic weapons
method and other contracting methods that contribute to the
utilization of private sector knowledge and expertise, and
tightening cost controls. In this regard, the MOD will expand
the items subject to project management and strive to adjust
the standards for the specifications and the review of project
plans with consideration of life cycle costs. Furthermore, for
more efficient acquisition, during the equipment selection
phase, the MOD will implement thorough life cycle cost
estimation, and analysis of alternatives, and secure binding
obligations against company principals.
Improving the Contract System and Other Related Matters
1 Reviewing Acquisition Systems
3
New anti-ship missiles for the
defense of remote islands
●
2 Long-Term Contracts, etc.
The production of defense equipment requires a significant
amount of time. Therefore, if a certain amount is to be
procured in bulk, a contract for more than five years is
needed in many cases. With regard to defense equipment and
services, economies of scale4 tend not to work mainly due
to the following reasons: (1) the MOD is the only customer;
and (2) companies that provide such defense equipment,
This is a system to conduct research, which contributes to the acquisition system of defense equipment, by inviting experts, such as associate professors from different universities
specializing in the areas of concern, in order to review and reconsider an effective procurement system, based not only on the viewpoints of the MOD personnel but also on theories that
have been proposed in the field of business administration and economics.
“Economies of scale” refers to the cost advantage that arises with an increased output of a product. For example, costs per unit can be reduced by a bulk purchase of materials.
DEFENSE OF JAPAN 2020
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents