The SACO Final Report on Futenma Air Station
(an integral part of the SACO Final Report) (tentative translation)
(Tokyo, Japan, December 2, 1996)
1. Introduction
a. At the Security Consultative Committee (SCC) held on December 2,
1996, Minister Ikeda, Minister Kyuma, Secretary Perry, and
Ambassador Mondale reaffirmed their commitment to the Special
Action Committee on Okinawa (SACO) Interim Report of April 15,
1996 and the Status Report of September 19, 1996. Based on the
SACO Interim Report, both Governments have been working to
determine a suitable option for the return of Futenma Air Station
and the relocation of its assets to other facilities and areas in
Okinawa, while maintaining the airfield’s critical military functions
and capabilities. The Status Report called for the Special Working
Group on Futenma to examine three specific alternatives: 1)
incorporate the heliport into Kadena Air Base; 2) construct a heliport
at Camp Schwab; and 3) develop and construct a sea-based facility
(SBF).
b. On December 2, 1996, the SCC approved the SACO recommendation
to pursue the SBF option. Compared to the other two options, the
SBF is judged to be the best option in terms of enhanced safety and
quality of life for the Okinawan people while maintaining
operational capabilities of U.S. forces. In addition, the SBF can
function as a fixed facility during its use as a military base and can
also be removed when no longer necessary.
c. The SCC will establish a bilateral U.S.–Japan working group under
the supervision of the Security Sub-Committee (SSC) entitled the
Futenma Implementation Group (FIG), to be supported by a team of
technical experts. The FIG, working with the Joint Committee, will
develop a plan for implementation no later than December 1997.
Upon SCC approval of this plan, the FIG, working with the Joint
Committee, will oversee design, construction, testing, and transfer
of assets. Throughout this process, the FIG will periodically report to
the SSC on the status of its work.
2. Decisions of the SCC
a. Pursue construction of an SBF to absorb most of the helicopter
operational functions of Futenma Air Station. This facility will be
approximately 1,500 meters long, and will support the majority of
Futenma Air Station’s flying operations, including an Instrument
Flight Rules (IFR)—capable runway (approximately 1,300 meters
long), direct air operations support, and indirect support
infrastructure such as headquarters, maintenance, logistics, qualityof-life functions, and base operating support. The SBF will be
designed to support basing of helicopter assets, and will also be
able to support short-field aircraft operations.
b. Transfer 12 KC-130 aircraft to Iwakuni Air Base. Construct facilities at
this base to ensure that associated infrastructure is available to
support these aircraft and their missions.
c. Develop additional facilities at Kadena Air Base to support aircraft,
maintenance, and logistics operations which are currently available
at Futenma Air Station but are not relocated to the SBF or Iwakuni
Air Base.
d. Study the emergency and contingency use of alternate facilities,
which may be needed in the event of a crisis. This is necessary
because the transfer of functions from Futenma Air Station to the
SBF will reduce operational flexibility currently available.
e. Return Futenma Air Station within the next five to seven years, after
adequate replacement facilities are completed and operational.
3. Guiding Principles
a. Futenma Air Station’s critical military functions and capabilities will
be maintained and will continue to operate at current readiness
levels throughout the transfer of personnel and equipment and the
relocation of facilities.
b. To the greatest extent possible, Futenma Air Station’s operations
and activities will be transferred to the SBF. Operational capabilities
and contingency planning flexibility which cannot be supported by
the shorter runway of the SBF (such as strategic airlift, logistics,
emergency alternate divert, and contingency throughput) must be
fully supported elsewhere. Those facilities unable to be located on
the SBF, due to operational cost, or quality-of-life considerations, will
be located on existing U.S. facilities and areas.
c. The SBF will be located off the east coast of the main island of
Okinawa, and is expected to be connected to land by a pier or
c a u s e w a y. S e l e c t i o n o f t h e l o c a t i o n w i l l t a k e i n t o a c c o u n t
operational requirements, airspace and sea-lane deconfliction,
fishing access, environmental compatibility, economic effects, noise
abatement, survivability, security, and convenient, acceptable
personnel access to other U.S. military facilities and housing.
d. The design of the SBF will incorporate adequate measures to ensure
platform, aircraft, equipment, and personnel survivability against
severe weather and ocean conditions; corrosion control treatment
and prevention for the SBF and all equipment located on the SBF;
safety; and platform security. Support will include reliable and
secure fuel supply, electrical power, fresh water, and other utilities
and consumables. Additionally, the facility will be fully selfsupporting for short-period contingency/emergency operations.
e. The Government of Japan will provide the SBF and other relocation
facilities for the use of U.S. forces, in accordance with the U.S.–Japan
Treaty of Mutual Cooperation and Security and the Status of Forces
Agreement. The two Governments will further consider all aspects
of life-cycle costs as part of the design/acquisition decision.
f. The Government of Japan will continue to keep the people of
Okinawa informed of the progress of this plan, including concept,
location, and schedules of implementation.
4. Possible Sea-Based Facility Construction Methods
S tu d ie s h a v e b e e n c o n d u c te d b y a “ Te c h n ical Support Group”
comprised of Government engineers under the guidance of a
“Technical Advisory Group” comprised of university professors and
other experts outside the Government. These studies suggested that
all three construction methods mentioned below are technically
feasible.
a. Pile Supported Pier Type (using floating modules)—supported by a
number of steel columns fixed to the sea bed.
b. Pontoon Type—platform consisting of steel pontoon type units,
installed in a calm sea protected by a breakwater.
c. Semi-Submersible Type—platform at a wave free height, supported
by buoyancy of the lower structure submerged under the sea.
5. The Next Steps
a. The FIG will recommend a candidate SBF area to the SCC as soon as
possible and formulate a detailed implementation plan no later
than December 1997. This plan will include completion of the
following items: concept development and definitions of
operational requirements, technology performance specifications
and construction method, site survey, environmental analysis, and
final concept and site selection.
b. The FIG will establish phases and schedules to achieve operational
capabilities at each location, including facility design, construction,
installation of required components, validation tests and suitability
demonstrations, and transfer of operations to the new facility.
c. The FIG will conduct periodic reviews and make decisions at
significant milestones concerning SBF program feasibility.
Defense of Japan
520
Reference
appropriate local officials, as well as the Government of Japan, of all
major accidents involving U.S. forces’ assets or facilities.
— Public exposure of Joint Committee agreements
Seek greater public exposure of Joint Committee agreements.
— Visits to U.S. facilities and areas
Implement the new procedures for authorizing visits to U.S. facilities
and areas announced by the Joint Committee on December 2, 1996.
— Markings on U.S. forces official vehicles
Implement the agreement on measures concerning markings on U.S.
forces official vehicles. Numbered plates will be attached to all nontactical U.S. forces vehicles by January 1997, and to all other U.S. forces
vehicles by October 1997.
— Supplemental automobile insurance
Education programs for automobile insurance have been expanded.
Additionally, on its own initiative, the U.S. has further elected to have
all personnel under the SOFA obtain supplemental auto insurance
beginning
in January 1997.
— Payment for claims
Make joint efforts to improve payment procedures concerning claims
under paragraph 6, Article XVIII of the SOFA in the following manner:
• Requests for advance payments will be expeditiously processed and
evaluated by both Governments utilizing their respective procedures.
Whenever warranted under U.S. laws and regulatory guidance,
advance payment will be accomplished as rapidly as possible.
• A new system will be introduced by the end of March 1998, by which
Japanese authorities will make available to claimants no interest
loans, as appropriate, in advance of the final adjudication of claims by
U.S. authorities.
• In the past there have been only a very few cases where payment by
the U.S. Government did not satisfy the full amount awarded by a
final court judgment. Should such a case occur in the future, the
Government of Japan will endeavor to make payment to the
claimant, as appropriate, in order to address the difference in amount.
— Quarantine procedures
Implement the updated agreement on quarantine procedures
announced by the Joint Committee on December 2, 1996.
— Removal of unexploded ordnance in Camp Hansen
Continue to use USMC procedures for removing unexploded ordnance
in Camp Hansen, which are equivalent to those applied to ranges of
the U.S. forces in the United States.
— C o n t i n u e e ff o r t s t o i m p r o v e t h e S O FA p r o c e d u r e s i n t h e J o i n t
Committee
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents