Priority Projects of the Army
1 – Recovery of Operational Capacity
2 – Cyber Defense
Army
Priorities
4 – SISFRON
6 – Air Defense
5 – Proteger
7 – ASTROS 2020
1. Recovery of Operational Capacity
The Project includes:
• modernization and revitalization of the Army’s aviation assets; combat vehicles M60,
Leopard 1A1; and armored vehicles M113, Urutu and Cascavel;
• acquisition of fluvial vessels, vehicles, field artillery materiel; individual armament
technologically superior to that which is currently utilized; and ammunitions,
armaments and equipment of collective use; and
• acquisition of the new IA2 assault rifle, developed and produced in Brazil by IMBEL64,
which meets the Joint Operational Requirements (ROC) of the Armed Forces approved
by the Joint Staff.
64
IMBEL — Brazilian War Materiel Industry, the country’s oldest factory of defense products.
DEFENSE WHITE PAPER
199
CHAPTER 5 — DEFENSE TRANSFORMATION
3 – GUARANI
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents