2. Recovery of Operational Capacity
In a modern Air Force, the management of projects demands a constant process of
performance evaluation and selection of alternatives to replace, modernize, develop or
revitalize aircraft and their systems, in order to strengthen and maintain the operational
capacity of the Force. This process is conventionally termed Recovery of Operational
Capacity, and it observes international efficiency standards adopted by modern Air Forces.
This project involves training and instruction of pilots, replenishment of weapons stocks
and technological upgrading of aircraft, including:
• the fighters AMX and F-5 — projects A-1M and F5-M;
• maritime patrol P-95 — Project P-3-BR;
• transportation and refueling — projects KC-130 and C-95M;
• reconnaissance — Project R-99; and
• airborne early warning and control — Project E-99.
The Brazilian Airspace Control System (SISCEAB) is based on a civil/military ambivalence
and is the outcome of the integration of resources. It provides the necessary infrastructure
to monitor and management Brazilian airspace, in order to ensure the continuity of general
air traffic management, military operational traffic and aerospace defense, throughout the
Brazilian territory.
The increase of air traffic in general, and particularly in the terminal regions require
the implementation of new technologies to support the safe and efficient operation of the
country’s air transport. Some actions involve the modernization of the Aerospace Defense
Operations Center (CODA) and the adaptation of aircraft to the new satellite control and
navigation system CNS/ATM68.
CNS/ATM — A program of international scope program for modernizing air traffic control. The acronym CNS stands
for Communications, Navigation and Surveillance. ATM stands for Air Traffic Management.
68
DEFENSE WHITE PAPER
205
CHAPTER 5 — DEFENSE TRANSFORMATION
3. Airspace Control
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents