Part IV Core Elements Comprising Defense Capability, etc. for that program is conducted by an Integrated Project Team (IPT), which is composed of officials from relevant divisions within the MOD. So far (as of the end of March 2022), for each of the 36 items that have been selected for major and semi-major programs, the MOD has formulated an Acquisition Strategy and an Acquisition Plan (hereinafter referred to as “Designated Item Plans”), which specify the basic matters necessary to systematically implement project management, such as the purpose of the acquisition program, acquisition policy, and life cycle cost. Furthermore, in principle, ATLA annually confirms the implementation status of the Designated Item Plans, and endeavors to promote appropriate project management reflecting the latest situation by conducting analysis and evaluation, and thus reviews the Designated Item Plans. In August 2021, analysis and evaluation of the acquisition programs were implemented for the 31 items for which the Designated Item Plans had been developed. Chapter See 4 Fig. IV-4-3-1 (Major Programs Designated for Project Management and Semi-Major Programs Designated for Project Management) Measures on Defense Equipment and Technology 2 Initiatives to Promote and Strengthen Project Management (1) Past Initiatives The following initiatives have been implemented to promote and strengthen project management. a. Cost and Schedule Management Using WBS For certain kinds of equipment, etc., produced in Japan, the MOD promotes the introduction of a management method to visualize the progress of work and cost generated by component (Work Breakdown Structure [WBS])2. Specifically, the MOD endeavors to manage costs and schedules to detect the signs of cost increase and schedule delays early so that swift measures can be 2 For the purpose of promoting acquisition reform, which is 461 (2) Future Initiatives In order to further promote effective and efficient equipment acquisition, the MOD needs to enhance the effectiveness and flexibility of project management throughout equipment life cycles. To this end, under the Mid-Term Defense Program (MTDP), the MOD/ SDF will take new initiatives, including incorporating successful examples in the civilian sector into the manufacture of defense equipment, actively adopting the competitive bidding method and other contracting methods that contribute to the utilization of private sector knowledge and expertise, and tightening cost controls. In this regard, the MOD will expand the items subject to project management and strive to adjust the standards for the specifications and the review of project plans with consideration of life cycle costs. Furthermore, for more efficient acquisition, during the equipment selection phase, the MOD will implement thorough life cycle cost estimation, and analysis of alternatives, and secure binding obligations against company principals. Improving the Contract System and Other Related Matters 1 Reviewing Acquisition Systems 2 taken by such means as utilizing an incentivized risksharing management contract system from April 2020 (see 2.3). b. Method for More Accurate Cost Estimate Life cycle cost has been estimated based on actual cost data of similar equipment developed or introduced in the past. However, as a larger amount of cost data is needed for a more accurate estimate, the MOD promotes the establishment of a cost database by collecting cost data and accumulating them into a database. c. Accumulation and Development of Expertise For further improving the management skills of PMs and enhancing human resources among those who engage in project management, the MOD provides opportunities to study project management methods from overseas and the private sector on a regular basis. a prompt response to swiftly changing surroundings, the MOD has been holding meetings of the Comprehensive Acquisition Reform Committee since 2007, in addition WBS is a hierarchical structure used to practice project management that systematically divides the project into manageable units, in which the schedule and cost of each deliverable (components and services) are allocated. DEFENSE OF JAPAN 2022

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents