aircraft project since April 2020.
Under this system, the public and private sectors
jointly manage the performance and progress of the
contract, manage the cost and minimize the risk of cost
overruns and schedule delays. When the cost is reduced,
part of the reduction is awarded to the contractor. This
system is aimed at reducing the price while incentivizing
3
Initiatives Aimed at Increasing the Efficiency of Procurement, and Other Related Initiatives
1 Effective and Efficient Maintenance
and Replenishment
With regard to periodic maintenance of defense
equipment, the MOD has been working to improve
efficiency by extending the maintenance interval, after
making sufficient efforts to ensure safety. Moreover, the
MOD is working to expand umbrella contracts such as
performance based logistics (PBL)8 from the perspective
of improving the equipment’s operational availability
and keeping long-term costs reduced. Furthermore,
the MOD is seeking to reduce costs by purchasing two
types of C-2 transport aircraft engines in bulk through
the FY2021 supplementary budget.
Chapter
4
Measures on Defense Equipment and Technology
See
Part II, Chapter 4, Section 2-3 (Initiatives for Increasing the
Efficiency of Procurement)
2 Achieving Further Efficiency in the
Acquisition of Defense Equipment
When acquiring defense equipment, the MOD aims
to reduce development, acquisition, and maintenance
expenses through the development of product families,
standardization of equipment specifications, joint
procurement of equipment common to multiple SDF
services, etc., in addition to a review of the contract
system. For example, in the FY2022 annual budget, the
MOD expects to be able to reduce the cost of Type-12
surface-to-ship guided missile model prototypes (with
improved abilities) by making them capable of being
fired from the ground, from warships, and from aircraft.
In addition, the MOD has been facilitating the
compilation of a database on the breakdown of
8
9
463
the contractor to reduce the cost.
In addition, a system to provide incentives for cost
reductions has also been implemented since April 2020
in order to evaluate companies’ own cost reduction
efforts. The expansion of the scope of application and
other approaches to encouraging such efforts have been
continuously considered.
procurement prices and actual price of major equipment
in the past. The MOD expects this database to be utilized
not only to verify the validity of procurement prices, but
also to enhance the accuracy and efficiency of life cycle
cost estimation for new equipment.
See
Part II, Chapter 4, Section 2-3 (Initiatives for Increasing the
Efficiency of Procurement)
3 Efforts to Increase Fairness and
Transparency
The MOD implements measures for making contracts
more appropriate and strengthening checking functions
to promote the enhancement of fairness and transparency
in relation to the acquisition of equipment and materials.
As a part of the effort to “make public procurement
more appropriate” across the whole government,
the MOD continues to carry out the introduction and
expansion of a comprehensive evaluation bidding
system9 and make bidding procedures more efficient.
In addition to these, based on reflection on the past,
strengthening system investigation, reviewing penalties,
ensuring the effectiveness of supervision and inspection,
and other measures have steadily been carried out
in order to prevent recurrence of such incidents as
overcharging and falsified results of equipment testing
by defense-related companies in 2012. Through these
measures, the MOD strives to surely prevent recurrence
of scandals, enhance fairness and transparency, and
make contracts more appropriate.
In addition, the ATLA carries out multilayered checks
on the contracts it administers through both internal and
external checking systems and checks and balances
Multi-year umbrella contracts for equipment inspections, repairs, and other sustainment and maintenance work with added conditions shortening repair times, ensuring a certain level of inventory,
etc. in order to improve equipment availability
Unlike the automatic bid system, which focuses only on price, this is a system whereby the successful bidder is determined on the basis of a comprehensive evaluation that includes both the price
and other elements. This method is adopted when it is appropriate to carry out such procedures as evaluating the technological elements.