• the development of helicopter capabilities: - conclude the replacement of multipurpose helicopters, - procure attack helicopters (depending on decisions taken in phase I, see para. 183), • the development of air defence and airfield capabilities: - modernise automated air defence C2 systems, - conclude the replacement of radars with new types of 3D radars, - replace/modernise ground-based firing assets of air defence, • the development of other air-force capabilities: - conclude the replacement of radio-electronic reconnaissance components, - conclude the replacement/modernisation of trainer aircraft and aircraft providing aerial photography, - procure a system aimed at countering rocket, artillery and mortar fire (C-RAM), - procure munition supplies for the air-force and air defence systems according to norms. ▶▶ of SOF will be: - to procure equipment and other materiel necessary for the finalisation of building additional capabilities, including capabilities for the planning and combat support of special air operations, - to procure equipment and othermateriel to develop capabilities required for counter-terrorist operations, including air mobility and, at the same time, for sustaining tactical land mobility. 5.4 Command and Control 187) The AF SR will develop their C2 system with a high level of interoperability with allied forces. In phase I, the personnel capacities of the General Staff administrative structures will be enhanced with the aim of enhancing and maintaining essential capabilities required to maintain the ability to plan and manage operations, as well as to command the AF SR. Emphasis will be placed on the resilience and sustainability of AF SR command and on ensuring a fluent transition towards C2 arrangements in war-time conditions. Necessary procedural and structural changes will continue in order to strengthen the unity of command and control at the particular levels of command. The capability and efficiency of AF SR C2 arrangements in preparing, coordinating and ensuring performance in relation to the collective defence of the Slovak Republic will be enhanced by the formation of the Slovak NFIU. The AF SR will develop their C2 system 188) In phase II, the implementation of measures for maintaining and enhancing AF SR C2 capabilities will be continued. Decisions on the further development of C2 structures will be taken in the context of changes in the security environment, including the possibility of merging individual branch HQs into one HQ in the state of security. OF THE SLOVAK REPUBLIC 73

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents