5-Year and 20-Year National Development Plan
ANNUAL TARGET
PROGRAMME
2017-2018
2018-2019
2019-
Walkway
upgraded
Walkway upgrade
Construction of
International Transit
Hotel in Nadi
Nausori airport and
terminal upgrade
2020-2021
2020
TOTAL OUTPUT
LEAD
EXPECTED
AGENCIES
2022
Walkway
upgraded
Transit hotel
constructed
Runway upgrade
and extension
2021-
Airport upgrading completed by
2020
Construction of
transit hotel
AFL
Nausori airport
upgraded
AFL
Provide Performance
Based Navigation (PBN)
for Nausori Airport similar Implementation of PBN as per the ICAO ASBU plan
to Nadi Airport
PBN
Implementation AFL
Surveillance control in the
domestic airspace
Implementation of
ADS-B & MLAT
Implementation
of ADS-B &
AFL
MLAT
Aeronautical Information
Management (AIM) &
System Wide Information
Management (SWIM)
Implementation of AIM & SWIM as per
ICAO ASBU plan
Implementation
of AIM &
AFL
SWIM
New ILS/DME for Nadi
& Nausori airport
Commissioning of Nadi ILS/DME
in 2017 and Nausori ILS/DME in
2018
Improve
precision
landing
AFL
Modernisation and
Harmonisation of
Fiji’s Air Navigation
Regulations and Standards
with international
requirements and best
practices
Air Navigation
Regulations and
Standards in line
with international
requirements
Compliance
with
international
standards
CAAF
Progress Fiji’s
implementation of an
effective safety oversight
system to meet ICAO
standards
ICAO standards
met
ICAO
standards met
CAAF
Slipway
upgraded
Govt/ FPCL
FS completed
FRA/ FPCL
Construction of the
Fiji Aviation Academy
(flight simulators, new
pilot training, cabin crew
training and all wet and
dry drills for cabin and
pilot crew)
Completed
Expansion of Slipway
and upgrading Ship
Repair facility (this include
modernising the workshop
facilities)
Slipway
upgraded
Undertake further
technical, economic and
environmental studies
and detailed design to
confirm the viability of
new international port in
Vanua Levu.
Study completed
Explore viability for
construction of Rokobili
Port
To be explored after the completion of Ports Master plan
MPE/ FPCL
Secure PPP for financing
of Rokobili Port
Financing to be secured
MPE/ FPCL
Upgrade and Expand
Lautoka and upgrade by
strengthening the wharf
structure at Suva Ports
Suva and Lautoka Ports upgraded and expanded
Upgrading
works
completed
MPE/ FPCL
AFL: Airports Fiji Limited; CAAF: Civil Aviation Authority of Fiji CL: Coastal License FPCL: Fiji Ports Corporation Limited; ICAO: International Civil Aviation
Organization; MPE: Ministry of Public Enterprises; RESA: Runway End Safety Area; RNP: Required Navigation Performance; PBN: Performance Based Navigation;
AIM: Aeronautical Information Management; SWIM: System Wide Information Management; ADS-B: Automatic Dependant Surveillance- Broadcast; MLAT: Multilateration; ILS: Instrument Landing System; DME: Distance Measuring Equipment.
86
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents