Water loss rate (water not paid for) is 41% as a result of the attacks on water networks and sources and low efficiency of supply and distribution systems for domestic and industrial and agricultural purposes due to financial inability to sustain them. This situation has led to economic, social and political pressures. To prevent water from becoming an obstacle to development, the government allocated more money to meet the growing demand for water and to find additional water sources. Serious efforts have been made to ensure the sustainability and maximum utilization of water and reduce waste of water, and therefore using water for developmental purposes. In addition, legislation and laws have been passed to preserve water resources, develop water sustainability strategies and distribute water equally across the Kingdom. Jordan withdraws approximately 25-30% more water than its internal resources can provide. The problem of scarcity is compounded by chronic inefficiency. The national water network is estimated to lose approximately 41% of the available daily supply through leaks and theft from the network. Keeping the current price of water to end users constant and assuming full usage and efficiency in the distribution network, this water loss represents JD120 million of lost government revenue each year, which represents 67% of the current revenues earned from water charges. Despite severe scarcity, Jordan has been able to provide its people with high levels of water supply and sanitation services whereby 97% of its urban and 91% of its rural population have access to water. However, water supply is intermittent, with many households receiving water once a week. Sani services cover 58% of the population. Although the efforts to boost supply, such as the Di conveyance project, and stem losses from the system by reducing leaks and theft, are important, can and should be done on the demand side to change consumption behaviors. The successful private sector participation in the water sector (Wastewater Treatment Plant Project and the Disi Water Conveyance Project) and commercial-based business through establishing water companies, have contributed to increasing water security. Future plans include improving the sector's financial efficiency to ensure sustainable achievement of sectoral goals of raising per capita domestic water consumption rate over the next ten years to about 445 liters/day, and increase the population connected to water networks to 95%. The Ministry will seek to distribute water equally among the Kingdom's governorates and remote areas, and provide enough water to meet the needs of economic, agricultural, industrial, tourism and trade sectors. Plans also include increasing the population connected to sewage networks from 58% to 75% by 2025. With regard to the reuse of treated wastewater, the Ministry seeks to increase the quantity to be used in agricultural and industrial fields, so that 100% of treated water is used. 1.4.6.2 Energy Security Jordan imports about 97% of its energy requirements, which includes mainly crude oil, oil derivatives and natural gas. Local sources cover the remaining 3% of requirements with renewable energy contributing only a small proportion to this mixture. In 2013, total primary energy consumed in Jordan was about 8.2 million tonsof oil equivalent, 82% of which are Crude oil and oil derivatives, 11% natural gas, 3% renewable energy and imported electricity and 4% petroleum coke and coal. ‘The high annual growth rates of demand for energy (5.5% for primary energy and 6.4% for demand for electricity), compared to global levels is one of the Kingdom's most significant development challenges. The influx of Syrian refugees into Jordan has increased the demand for energy and electricity. Per capita primary energy consumption is 1250 Kilograms oil equivalent (kgoe), and per capita share of electricity is 2230 kilowatt-hour (kWh), which are higher than in comparable developing countries. Energy consumption density was 208 kgoe per $1,000 of GDP, which is high compared to developed economies where energy consumption density is about 150 kgoe per $1,000 at fixed prices. The installed electricity generation capacity is currently 3900 MW. Work is underway to ensure additional generation capacity by expanding power generation through special generation projects ‘owned and funded by the private sector. The national electricity grid for transmission and distribution has expanded to cover the Kingdom's governorates and most rural and remote communities. The percentage of the population with electricity supply reached 99.9% in 2013, which is similar to rates in advanced economies. Electricity tariff rates for consumers are heavily subsidized at about 100% of consumer prices. To address this imbalance, a national plan for the gradual removal of subsidies by increasing electricity tariffs annually was approved so that by the end of 2017, full costs will be recovered and the Treasury will stop subsidizing the electricity sector. Work is also underway to reduce electrical losses by 17% on transmission and distribution networks. In order to ease the burden of the energy sector on economic and social development, a comprehensive national strategy is now being pursued to increase the contribution of local sources in the total energy mix through a number of initiatives. The most important of these are expanding renewable energy projects, activating energy efficiency programs, using oil shale as an alternative resource for producing electricity and producing shale oil, using nuclear power as an alternative energy source, further expanding the use of natural gas in power generation and promoting energy interconnection projects between countries in the region to achieve greater energy security. os TAN

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents