3. Development of the Navy’s Core Capabilities The project is absolutely necessary, not only to modernize the Navy, but, also, to enable the gradual substitution of the naval, naval aviation and amphibious combat means, which have a deactivation deadline due to natural deterioration and to the endurance limit of these means. The lifecycle limits of materiel are already established, which makes compliance with the program all the more essential. The program therefore aims to expand the operational capacity of the Brazilian Navy. The following actions, within its scope, are noteworthy: • The development of submarines (PROSUB), which includes the construction of four new conventional submarines and one nuclear propelled submarine, in addition to a shipyard and submarine base to support these units, as described in chapter 3; CHAPTER 5 — DEFENSE TRANSFORMATION • The acquisition of surface means (PROSUPER), which aims to develop the ability to design and build, in Brazil, five escort vessels, five ocean patrol vessels of 1.8 thousand tons and one logistical support vessel. Proposals submitted by interested shipyards are currently under analysis; • The design and construction, in Brazil, of 27 patrol vessels of 500 tons, two of which have already been received and fiver others are under construction in the country, with expected delivery by 2014; • The acquisition of amphibious means — one combat vehicle landing ship (NDCC) or one dock landing ship (NDD). The Amphibious Ship Procurement Program (PROANF) has initiated research aimed at obtaining, abroad, a design of an amphibious ship, approved and operated by other navies, for future construction in a national shipyard; • The acquisition of aircraft carriers (PRONAE), which involves designing and building one unit for the First Fleet and another for the Second Fleet. The PRONAE is analyzing alternatives for developing the project nationally or with partnership abroad; • The creation of marine battalions for riverine operations. Once the Manaus Battalion is established, the transformation of the Marine Group of Belem will be completed by 2017; and • The recent acquisition of three ocean patrol vessels of 1.8 thousand tons that will be incorporated into the Navy by 2013. 4. Blue Amazon Management System (SisGAAz) This system should be fully implementation by 2024. It will allow monitoring and control of the Brazilian jurisdictional waters and provide the following benefits: 196 DEFENSE WHITE PAPER

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents