Light Armor Vehicle (Combat) By the end of 2017 equipping and phasing into operational use of the light armor vehicles (M-ATV, MRAP) will be carried out in cooperation with bilateral partner. Air Defense Assets and one EOD platoon) with engineering machines, trucks, EOD equipment and special EOD vehicles. The Armed Forces will also begin equipping with new engineering systems necessary for realization of the accepted NATO Capability Targets. Weapons of the Croatian Army comprise of Air Defense guns of 20 mm caliber, self-propelled surface to air missile systems S-10 CRO and S-10M and shoulder launched “IGLA” and “S2M” light missile systems. All artillery AD systems as well as manportable, shoulder-fired low altitude surface-to-air missile system S-2M have been proclaimed non-prospective. For requirements of the Air Defense capability for protection of maneuver units, Croatian Army will be equipped with systems of short range for Air Defense of the maneuver units (MANPADS). NBCD Assets and Equipment Engineering Assets The priority in the forthcoming period will be equipping of the Croatian Army units with assets that provide conditions for implementation of the NATO Capability Targets. Signal assets and systems will also be provided simultaneously with the equipping with combat armor vehicles, self-propelled artillery systems, light armor combat vehicles, Air Defense systems and BVP vehicles. The existing bridging and pontoon assets and equipment are tactically and technically outdated and are not meeting the new requirements. Consequently, there is a high level of malfunctioning, high maintenance costs and the inability to provide full engineering combat support in the segment of ensuring mobility of the maneuver units in operations. In conformity with the new operational requirements for maintaining operational tempo in high mobility operations, in the forthcoming period priority for the Armed Forces will be to finish equipping of the declared Engineering forces for NATO (one Platoon and one Company for general engineering support, one platoon for engineering combat support Resource life cycle has expired for most of the personal Nuclear, Biological and Chemical protective equipment (PPE), self-protection and personal decontamination assets. Priority in the forthcoming period will be given to equipping of the Armed Forces units with individual protective equipment, treatments for the first self-help, dosimeter, and equipment for personal decontamination of the skin, clothes, personal gear and personal weapons as well as equipping of the multifunctional NBC protection platoon. The adopted Capability Targets also involve obligation of providing networked chemical and radiological point-detectors, deployable assets for collective protection against NBC agents/hazards and assets for establishment and development of the NBC Warning and Reporting System. Signal Assets and Systems 69

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents