are of key importance in building capabilities, through which NATO Capability
Targets are reached. Therefore, they are
necessary for the efficient execution of
the missions and tasks. Projects of the
second priority level are important for
Armed Forces activities; they upgrade
capabilities, and affect dynamics and
quality of single capabilities. However,
the scope and dynamics of their realization are to the certain degree subject to
corrections. Priorities of the third level
are subject to significant corrections in
the scope and dynamics of realization.
Croatian Army Priorities
The priority of the Croatian Army is modernization and equipping of the key maneuver units of the Armed Forces. In the
period till the year 2020 priority will be
given to equipping of the Mechanized
Guard Brigade and that represents a direct contribution to realization of the
NATO Capability Targets. The second
priority in the period till the year 2020
is equipping other declared units. In the
period from 2021 till the end of 2024
and even beyond that period, projects
of equipping and modernization of the
Guards Armored-Mechanized Brigade will
be initiated as indispensable for retaining
and increasing the level of its capabilities.
Infantry Weapons and
Equipment
The quantities of serviceable infantry
weapons in the Armed Forces meet requirements of the proposed structure.
These weapons are technologically obsolete and their calibers and maintenance requirements do not provide for
harmonization of the operational activi-
ties with the Armed Forces of NATO and
EU members.
In the previous planning period the
Armed Forces began equipping with the
new VHS assault rifle and accompanying
equipment (of NATO caliber) in a quantity
of 6,000 pieces. Equipping will continue
in the first two planning periods in order
to complete equipping of the CAF Active
Duty component by late 2020. Equipping
of the CAF Reserve component with the
VHS assault rifle is planned for the third
planning period.
By late 2020 it is necessary to equip other units of the Croatian Army
declared for the NATO Pool of Forces with machine guns and universal machine guns of NATO caliber. Equipping of the Active Duty
component with this type of weapon should be completed by the end
of the entire planning period. Given the fact that the Armed Forces
have no ammunition of NATO caliber in stock, along with procurement of the new assault rifles, machine guns and light machine guns,
it is necessary to equip the CAF with accompanying ammunition.
Within the planning period, priority is
given to continued equipping the troops
with individual equipment until the
Armed Forces are fully equipped, including renewal of the following equipment:
camouflage uniforms with digital press,
military boots and combat helmets,
combat modular vests, backpacks and
individual night vision devices. CAF
units declared for NATO and EU operations should be equipped to operate under extreme weather conditions.
The project of equipping troops with
upgraded systems of performance, protection and communication will begin
in the second part of the planning period. Priority in equipping with infantry
weapons and equipment will be given
to units scheduled for deployment to
NATO / EU operations.
67
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents