Recent Developments in the Energy Sector The Government of Nepal continues to actively pursue measures to overcome load shedding and energy shortage issues in the country. Following the appointment of a new director at the NEA and strong government support, Nepal became load shedding free in May 2018 from improvements in the efficiency of supply and demand management. Having resolved load shedding issues for both household and industrial users, the NEA is currently focusing on maintaining consistent power supply with quality and safety as priorities. The NEA is also taking bold steps to strengthen its financial position through organizational restructuring exercises as well as introducing transparent transfer modality and other measures to improve services, reduce power wastage, and collect outstanding revenues. Recognizing the need to develop its energy sector to reduce poverty and reinvigorate the economy, the government is prioritizing energy development projects with multiple targets set over the next few years. It is also actively driving efforts to develop hydropower capabilities through initiatives such as the Nepal Power Investment Summit 2018. Additionally, the Nepal government is focusing beyond traditional energy resources. The government intends to leverage its abundant natural resources such as, hydro, solar, wind, and bio-mass to meet the country’s energy demands and reduce the power deficit. To promote and upscale the production of renewable energy sources, the Nepal government formed the Alternative Energy Promotion Centre (AEPC), supported by the Renewable Energy for Rural Livelihood (RERL) project. Case study – Bhutan’s ambitious hydropower developments to become a net exporter of energy Over a 10-year period (2005–2015), Bhutan, a developing nation with similar topography to Nepal, increased its electricity production from 460 MW to 1606 MW,86 mainly generated through hydropower. Bhutan’s electricity exports grew from US$78 million in 2005 to US$176 million in 2017, contributing to 40% of its total exports and generating 25% of the government’s revenue. Four out of five of its major hydropower projects are financed by the Indian government, with the fifth financed by the Asian Development Bank (ADB) and loans from Indian banks. The investment arrangement helps to cover the financial and construction risks of hydropower projects, with India committing to purchase surplus electricity reflecting production costs plus 15%.87 Rapid development in the energy sector is reinvigorating Bhutan’s economy, with gross GDP projected to record 9.9% in the fiscal year ending 2018. Although current and future revenues generated from energy exports are forecast to cover the cost of hydropower investments, the Bhutan government is taking measures to monitor its hydropower-related costs closely. Under a 5-year plan, the government has stipulated that hydropower debt should not exceed 40% of hydropower earnings, while non-hydropower debt is limited to 35% of GDP. Challenges in Nepal’s Energy Sector The Himalayas cover approximately 75% of land in Nepal providing the country with ample water resources and a favorable terrain for electricity production. Despite its power generation potential, Nepal is a net importer of electricity. In meeting the growing demand for energy, Nepal’s electricity imports increased at an average annual growth rate (AAGR) of 20.4% between 2011 and 2016, while NEA’s electricity generation grew at 0.3% annually over the same period. Key hurdles facing Nepal’s energy sector include: ● 86 87 Acute power shortfall, particularly during the dry season when water flow drops, adversely affecting hydropower generation Hydro World Nikkei Asian Review, Aug 2017 98

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents