and US$40 billion in revenue. More than 500,000 jobs are expected to be created outside NCR at a
CAGR of 11% helping employment opportunities in distant areas.. 45
MalaysiaMalaysia had launched HSBB plan in 2008 to expand the capability and reach of its broadband network
to enhance business and local infrastructure for improved connectivity using next-generation internet.
The project mentioned two categories of connections under the plan
High Speed Broadband (HSBB)- for residential household and businesses across select
geographic areas, connection speed to be 10-100 Mbps, with final speed for connection in
economic centers and businesses being 1Gbps.
Broadband to General Population (BBGP) - connection for general public with speeds from 256
Kbps-2 Mbps46, reaching up to 10 Mbps.
Project was designed to be spread across 10 years and in two-phases. Agreement on investment and
implementation was signed between Ministry of Energy, Water and Communication (KTAK) and
Telekom Malaysia (TM) under Public-Private Partnership (PPP). The program aimed to provide last
mile connectivity using Fibre-to-the-home (FTTH), Ethernet-to-the-Home (ETTH) and Very High Speed
Digital Subscriber Line (VDSL2) to homes and businesses across the country.
Investment in the project over 10 years was estimated to be US$3.23 billion in 2008, of which US$685
million was to be contributed by Government of Malaysia and US$2.54 billion was to come from
Telekom Malaysia itself.
First phase of the project was rolled out in mid-2008 to 2012, with aim to achieve 50% broadband
penetration across households by 2010 and total of 1.3 million households are to be covered by 2012.
The economic impact of HSBB and its sub-projects were immediate and visible. By 2010, HSBB
project contributed 1% to GDP and 135,000 new-jobs. The jobs were spread across core-telecom
sector, internet and contract under infrastructure lay-out.
Second-phase of the plan, HSBB 2 was rolled-out in 2015, with a budget of US$ 885 million47 distributed
across expansion of HSBB network and simultaneously upgrading existing copper-lines (sub-urban
broadband) to be HSBB compatible for next 10 years. Contribution of TM was to be total of US$535
million and that of government to be US$350 million.484950
Expected Benefits Projected by 2020
Total gross national income contribution to be US$15.1 billion
Income from potential spill-over effect up to USD2.33 billion from communication content and
infrastructure sector.
In 2020, expected job creation to be 43,162.
Further investment – Malaysian government has launched the National Fiberisation and Connectivity
Plan (NFCP) with a budget of US$ 240 million expects to boost the internet speeds to 30Mbps in 5 –
years while lowering the broadband access cost for residents.
45
http://itbpm-roadmap2022.ibpap.org/
minimum internet connection speed for broadband 2008
47
Conversion rate as of December 2015, 1USD=RM4.30
48
http://www.mida.gov.my/home/2937/news/tm-to-invest-rm2.3bil
49
International Broadband Initiatives in Malaysia, July 2014, MCMC
50
HSBB: Malaysia’s Drive for High Speed Broadband, Jan 2009, my Convergence, MCMC
46
40
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents