I-ID Digital Initiatives Prio (DI) rity Programs / Projects Indicators Assumptions Expected Outcome Timeframe Timeline (Year) Focal Agency Supporting Actors 1 2 3 4 5 04.01.42 EMIS 2.0 P2 Numbers of Use of EMIS 2.0 is public schools made mandatory using EMIS 2.0 for all public schools Evidence based Medium 1 1 1 x x MoEST DoE, CTEVT, Universities and data driven -Term policy making significantly facilitated Major Activities Conduct a study to document the outcome, learning and shortcomings and requirements 04.01.42.01 for improving upon the existing EMIS system and prepare a design document for EMIS 2.0 incorporating current issues and expected changes from the upgraded system. 1 MoEST DoE, CTEVT 04.01.42.02 Finalize system requirements of EMIS 2.0, carry out necessary changes in the existing system and port all data, users and other documents for day-to-day operation. 1 MoEST DoE, CTEVT Conduct workshops on training and on-boarding of the management, administration, 1 1 04.01.42.03 faculties and technical team members of schools, colleges, and various boards at central, provincial and local level to accept, adopt and use the EMIS2.0 for regular inputs, updates and operation of educational institutions. MoEST DoE, CTEVT 04.01.42.04 Develop and carry out regular monitoring and evaluation, system upgrade, maintenance and support for EMIS 2.0. MoEST DoE, CTEVT 203 1 1 1

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents