when examining the impact of 30% utilisation the higher operating costs reduced the number of available connections with sustainable operation to 242,000. Coverage of 314,000 dwellings with FTTH technology would require total subsidies of around CZK 12.1 billion. 2. Coverage of the remaining number of dwellings (60,000 to 100,000 permanently occupied dwellings) must be implemented with the use of public aid through a different suitable technology, respectively a combination of various technologies, including wireless, which will be capable of ensuring the economic sustainability of the investment while retaining an acceptable quality of services. 3. The economic analysis also showed that the share of subsidy in the construction of NGNs will most probably be between 50% and 75% at an acceptable level of return on investment. In the case of the coverage of territory with very unfavourable conditions, the OP EIC Managing Authority is exceptionally able to accept even a higher subsidy level if this is shown to be absolutely necessary. In any case, the subsidy level is one of the selection criteria and will be proposed by the applicants themselves. It is anticipated that in order to achieve full coverage of permanently occupied dwellings, including those that are most demanding in terms of investment, the total allocation determined for specific objective 4.1 of the OP EIC will be used. In the unlikely case of insufficiency of the allocated subsidy funds, other resources will be sought at national level. 4. The results presented in points 1. and 2. of this chapter show that there is no single best solution, and therefore it will be necessary to seek an optimal technical solution for each individual area of intervention. It was also shown that the construction of NGAs and their subsequent operation is a business opportunity not only for large players on the market, but also for SMEs. 5. The analysis of investment costs confirmed that it is not the new technologies but rather the construction work that makes up the largest share of costs in the construction of NGAs, which is demonstrated below in image No 8 showing the ratios of the relevant costs to the average cost for the construction of backhaul NGAs. The solutions outlined in the text of chapter 6.2 are thus essential to ensure that both the wholesale and also primarily the retail price of Internet access can be reduced, which is one of the important factors to achieve higher overall usage of the constructed NGAs. 49

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents