Annex No 5
Economic analysis - model of investments
in access networks
Task
1.
Estimate the investment demands for the construction of FTTH/FTTN for BSUs,
respectively larger areas, with NGA parameters.
2.
Estimate the necessary amount of subsidy with regard to the considered ROI
parameters in combination with the investment and operating costs for FTTH/FTTN
NGAs.
3.
Verify the long-term sustainability parameters of the investments (in particular in relation
to ROI, operating cost levels, and the projected lead-in to use the installed capacities).
4.
Estimate the total investment demands for the construction of backhaul networks for
FTTH/FTTN solutions.
5.
Estimate the total investment demands for coverage of all address points for individual
“colour” categories (black, grey, white) of BSUs with NGA infrastructure – including a
quantification of the anticipated price per FTTH/FTTN connection and the structuring of
output for white areas according to region.
6.
Estimate the share of costs for the establishment of backhaul networks, distribution
networks and user networks, including active network elements.
7.
Estimate operating costs for network operation and service and the related operating
costs.
Network topology
1) GPON FTTH (Fibre to the Home)
Optical fibre into the home
2) FTTN (Fibre to the Node)
DSLAM cabinets
VDSL2 / vectoring
Cu pair length up to around 500 m
74
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents