OPPORTUNITIES
THREATS
The creation of new jobs and
strengthening modern types of
work, e.g. work from home
The development of the digital
economy will positively affect
reductions in the end price of
technologies and applications
Growth in the number of simple
mobile terminals
Major assumptions relating to the
onset of the Internet of Things
Growth in demand for electronic
services by households and
corporate participants
Increase in the competitiveness of
providers of advanced digital
services on a market defined by
equal conditions of technological
neutrality
Increase accessibility to public
funding for the construction of highspeed electronic communications
networks
Reduction in investment costs for
electronic communications
networks enabling high-speed
Internet access by reducing the
administrative workload
Construction of electronic
communications access networks
will increase readiness for the
arrival of new technologies and
services, e.g. IoT, M2M
Significant reduction in the gap in
access to high-speed Internet
access between rural areas and the
rest of the country
Elimination of difference in quality
of life between regions, thereby
increasing the competitiveness of
regions and the CR as a whole and
also on foreign markets
Use of existing building projects in
infrastructure (water, sewers,
roads) and the implementation of
smart grids with the objective of
using synergies
Developing the population’s digital
skills
54
Insufficient level of digital literacy
and skills in the population and
inadequate defence against cyber
crime
Lack of experience with subsidy
programmes for the construction of
electronic communications networks
and the consequent risks
Offer of cheap services built on
technologies that are not able to
achieve the parameters of NGA
networks, which overrides the
interest of users in new services with
significantly higher value and greater
potential
Insufficient and ineffective measures
to reduce the investment demands
of electronic communications
structures
Unbalanced demands from local
authorities in relation to the
“physical” construction of electronic
communications networks in some
regions
Incorrect assessment of the quality
of the existing and considered
(three-year period) offers of Internet
access services in different locations
as a consequence of incomplete or
incorrect data from the owners or
operators of networks
Underestimation of the financial
costs for construction of high-speed
NGAs
Insufficient design and
implementation capacities for the
implementation of forward-looking
plans.
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents