Test the Disaster
Recovery/Contingency
Plan at least once a year
In order to ensure smooth transition, the disaster recovery/contingency plan
should be tested yearly if not more. The testing of the plan has the added
advantage of keeping the personnel trained and skills fine-tuned as well as
identifying likely operational problems. The plan should also be evaluated
periodically to ascertain that it is still appropriate and meeting the purpose
it was intended for.
In ensuring against business interruption, recommended actions under the
disaster recovery/contingency plan are:
(a) include telephone and voice mail service continuation to ensure the
continued availability of voice mail and telephone services;
(b) include image systems and facsimile capability to ensure against
business interruption due to loss of image systems;
(c) include e-mail service continuation to ensure business continuation
in case of loss of e-mail services;
(d) continued availability of information stored on microfilm, microfiche,
or other mass storage media should be ensured through the following
procedures:
i. include mass storage media, as part of the contingency and
disaster recovery plan;
ii. provide for back-up of all important files, critical business
data, important programmes and documentation to enable
business resumption of core processes;
iii. the frequency of back-up should be in-line with the importance
of the information and the business resumption plan;
iv. back-up should be securely stored, and the recovery procedure
checked and tested regularly for reliability; and
v. access to back-up should be strictly controlled.
(e) include paper documents and media storage to ensure that vital
business records are not lost through destruction or loss of paper
documents;
(f) protect government operations from disastrous effects of fire and/
or water:
i. a business continuity or resumption plan should be in place
and fully tested; and
ii. back-ups of all important information, services and resources
should be available.
(g) protect buildings containing key equipment and the key equipment
against the effects of lightning; and
(h) protect against natural disasters by avoiding disaster prone areas.
3.8
A security incident affects
confidentiality, integrity,
availability and
accountability
Public Sector ICT Security Incident Handling
A security incident is an incident that affects either directly or indirectly, the
confidentiality, integrity and availability of the ICT system.
Incident handling is similar to first-aid. Once an organisation suffers a disruption
and is given an ‘incident handling’, where its ICT infrastructure needs to
undergo a proper overall security diagnosis.