MyMIS Network managers should ensure that appropriate controls are established to ensure the security of data in networks, and the protection of connected services from unauthorised access. Special attention is required to protect sensitive data passing over public networks like the Internet. 4.4.2 Security of Network Equipment In order to effectively include security in the procurement process of network systems or equipment, it must be integrated into the procurement cycle from its inception. Sufficient information about the procurement cycle is included to allow a person not familiar with the procurement process to understand the need for incorporating computer security into the procurement cycle. Acquisition planning can only begin after an agency has determined that a need exists. The need determination phase is very high-level in terms of functionality. No specifics of a system are defined here. The idea for a new or substantially upgraded system and the feasibility of the idea need to be explored. During this early phase of the acquisition, the definition of the security requirement should begin with the preliminary sensitivity assessment. The preliminary sensitivity assessment should result in a brief qualitative description of the basic security needs of the system. These should be expressed in terms of the need for integrity, availability, and confidentiality. This does not require an elaborate sensitivity analysis scheme, but must include an assessment of the significance of the systems. Legal implications, federal policy, agency policy, and the functional needs of the system help determine the sensitivity of a system. Factors including the importance of the system to the agency mission and the consequences of unauthorised modification, unauthorised disclosure or unavailability of the system or data should be considered when assessing sensitivity. 4.4.2.1 Pre-installation security check After undergoing a security check during the procurement process, any equipment that is to be installed must have undergone a Factory Acceptance Check (FAC), prior to installation, and then configured. 4.4.2.2 Ensuring physical security Installation Security Physical Security The following standards of physical security must be observed: (a) premises housing network control equipment must be physically strong and free from unacceptable risk such as flooding, vibration, dust, etc; (b) air temperature and humidity must be controlled to within equipment defined limits; and (c) network electronics must be powered via Uninterruptible Power Supply (UPS) to provide the following: i. minimum of 15 minutes’ operation in the event of a power blackout; and ii. adequate protection from surges and sags. Copyright MAMPU Chapter 4 - 15

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents