FIVE YEAR DEVELOPMENT PLAN 2017-2021 ANNUAL TARGET TOTAL PROGRAMME OUTPUT 2017-2018 111 Ginger Development Programme 400 2018-2019 400 2019-2020 400 2020-2021 400 2021-2022 EXPECTED LEAD AGENCIES 400 2,000 MoA MoA (No. of farmers assisted) Livestock Extension and Research Programme 5% 5% 5% 5% Increase in livestock production by 5% per annum 60 60 60 60 60 300 farmers. 15% increase in milk production MoA 20 20 20 20 20 100% (92 schemes) MoWa 40 60 80 80 80 80% of livestock tested MoA 40 50 50 60 60 60% of livestock replaced MoA Livestock Sector 5% Strategy Dairy Development Programme (No. of farmers assisted) Drainage Subsidy (% of major drainage) BTEC (Eradication of Brucellosis and TB infections, % of livestock tested) Livestock Rehabilitation Programme (% replacement of poor dairy and beef livestock) Land Drainage and Flood Protection Programme Drainage and Flood Protection (rivers dredge) Watershed Management Farm Access Roads (No. of roads) Dredge Sigatoka P2, Penang P1 and Nasivi Continue dredging of Ba, Labasa, Rewa and Sigatoka River Dredging of Ba, Labasa, Rewa and Sigatoka River Maintenance of dredging equipment Dredging of small rivers and tributaries Reduce frequency of flash floods Construction of Namosi 3rd dam Planning for Namosi 4th dam Construction of Namosi 4th Dam Planning of Nawaka 3rd Dam Construction of Nawaka 3rd Dam 4 dams MoWa 20 20 25 25 50 140 MoA Rotuma and Yasawa Kadavu Taveuni 100% MoA MoWa, MoE Land Resource Planning Programme National Land Use Plan (Establishment of digital database and GIS) Lomaiviti group Lau group

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents