(4) The Authority shall prevent the creation of any entry barriers inherent to co-location and provide solutions to conflicts relating to it as rapidly as possible. (5) The Authority shall establish the minimal set of conditions that must be fulfilled in any co-location offer, after consultation with the operators of public telecommunication networks. (6) The conditions established under subsection (5) may lead to the specification, in every colocation offer, of the following(a) information on co-location sites; (b) precise location of the operator’s sites suitable for co-location; (c) publication or notification of an updated list of sites; (d) indications as to the availability of alternative solutions in the event that physical space for co-location is not available; (e) information on what types of co-location are available, and on the availability of electric systems and cooling equipment on the sites, as well as the rules governing sublease of the co-location premises; (f) indications on the time required to conduct feasibility studies for any colocation request; (g) information on equipment characteristics and any restrictions on equipment that can be accepted for co-location; (g) measures that operators offering colocation must take to ensure the security of their premises and to identify and resolve problems; (h) conditions under which competing ope94

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents