establishing the point of interconnection. Requests for new forms of interconnect-ion 70. (1) A request by an interconnecting operator for a new form of interconnection shall be in writing and provide the network controller with information about the form of interconnection, the approximate date the interconnection is required and an estimate of the capacity required. (2) The interconnecting operator shall forward a copy of the request for interconnection to the Authority. (3) The network controller shall, within fifteen days of receipt of the request for interconnection, inform the interconnecting operator in writing(a) of its ability to supply the form of interconnection requested and its schedule of supply; and (b) whether it is able to do so within the time frame requested by the interconnection operator. (4) If a dispute in negotiations arises, either the network controller or the interconnection operator may request the Authority’s assistance in resolving the dispute through mediation. (5) The Authority shall resolve disputes brought to it within one hundred and twenty days of its receipt of the referral or of receipt of information requested from the parties following the referral. (6) The network controller shall, where it has informed the interconnecting operator that it is able to provide interconnection, ensure that the system conditioning and provisioning procedures required to provide the interconnection are undertaken within forty-five days from the date of notification. (7) A network controller shall provide ninety days written notice to an interconnecting operator of any planned changes to its information and commu86

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents