UAE Information Assurance Regulation
T7.6.1
Change Control
Procedures
Priority
Applicability
P3
Based on risk assessment
Control
The entity shall control the implementation of changes by the use of
formal change control procedures.
Sub-Control
The entity shall:
1) develop a change control procedure
2) keep track record of all changes
3) keep a copy of every version of the software, adopting appropriate
integrity verification procedures
4) ensure all relevant documentations are up-to-date
5) ensure proper planning to perform changes implementation at the
right time
Implementation Guidance (for information purpose only)
Formal change control procedures should be documented and enforced in order to minimize the
corruption of information systems. Introduction of new systems and major changes to existing systems
should follow a formal process of documentation, specification, testing, quality control, and managed
implementation.
This process should include a risk assessment, analysis of the impacts of changes, and specification of
security controls needed. This process should also ensure that existing security and control procedures
are not compromised, that support programmers are given access only to those parts of the system
necessary for their work, and that formal agreement and approval for any change is obtained.
Wherever practicable, application and operational change control procedures should be integrated. The
change procedures should include:
a. maintaining a record of agreed authorization levels;
b. ensuring changes are submitted by authorized users;
c. reviewing controls and integrity procedures to ensure that they will not be compromised by the
changes;
d. identifying all software, information, database entities, and hardware that require amendment;
e. obtaining formal approval for detailed proposals before work commences;
f. ensuring authorized users accept changes prior to implementation;
g. ensuring that the system documentation set is updated on the completion of each change and that
old documentation is archived or disposed of;
h. maintaining a version control for all software updates;
i. maintaining an audit trail of all change requests;
j. ensuring that operating documentation and user procedures are changed as necessary to remain
appropriate;
k. ensuring that the implementation of changes takes place at the right time and does not disturb the
business processes involved.
185