UAE Information Assurance Regulation T7.6.2 Technical Review of Applications After Operating System Changes Priority Applicability P3 Based on risk assessment Control The entity shall review and test business critical applications after changes in the operating systems. Sub-Control The entity shall: 1) test any application in a testing environment when operating systems are changed (including patches and configurations) 2) monitor operating system and application logs for any anomaly 3) always define a rollback procedure 4) ensure that changes are reflected in any asset database and in any technical contingency plan Implementation Guidance (for information purpose only) This process should cover: a. review of application control and integrity procedures to ensure that they have not been compromised by the operating system changes; b. ensuring that the annual support plan and budget will cover reviews and system testing resulting from operating system changes; c. ensuring that notification of operating system changes is provided in time to allow appropriate tests and reviews to take place before implementation; d. ensuring that appropriate changes are made to the business continuity plans. A specific group or individual should be given responsibility for monitoring vulnerabilities and vendors’ releases of patches and fixes. T7.6.3 Restrictions on Changes to Priority Applicability Software Packages P2 Based on risk assessment Control The entity shall restrict the changes to software packages. Sub-Control The entity shall: 1) define who is entitled to approve changes to software/applications 2) test any change in a testing environment before moving it to production environment 3) in case of major changes in critical software and applications, perform a Secure Code Review 186

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents