Strategic Lines of Development Lines of Action Comments companies; Improving the Transparency and Coordination in the Relevant Civil Works. (Operational) Simplifying the Authorization Procedures for New Developments. (Enabler) Norms Regarding NGN Infrastructure for New Buildings (Enabler) • Improving transparency regarding the inventory of existing infrastructure. • Developing a system to inform the operators with regard to the civil works planned by local authorities • The systematic possibility to mount pipes and related infrastructure together with the performance of public works • Increasing transparency and coordination between the public authorities involved in the granting of permits; • Establishing a point of information with regard to such permits; • Defining a maximum time limit for granting/declining. • 30-60% of the costs can be saved in case of the new buildings prepared for access to NGN infrastructure; • Defining requirements and including such requirements in the permit granting criteria; • Ensuring undiscriminating access to the terminal segments of NGN. Page 103 of 172

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents