Telecommunications Bill, 2021 64 No. of 2021 (c) request and obtain written permission from the Commission and any relevant Ministry of the Government; and (d) notify the Commission of any intended road works. (3) On receiving a notification under subsection (2) (d), the Commission shall notify other operators or public utilities of the intended road works and inquire whether they have any intention of undertaking similar road works. (4) Unless there is an emergency, no road works shall commence until the expiration of 14 days from the date of the receipt of the permission. (5) An operator need not obtain the permission required by paragraph (2) (c) where the Commission certifies in writing that the intended road works are necessitated by an emergency. (6) The removal or alteration of a utility installation shall be undertaken by the affected utility installation owner, and the operator shall pay the costs associated with the removal or alteration at the utility owner’s standard rates, which must be cost oriented. (7) An operator or public utility that has been notified shall not carry out road works in the area to which the notification relates within 3 months of receiving the notification unless the operator proves to the satisfaction of the Commission that it is necessary to carry out emergency works. (8) A member of the Board, officer of the commission, agent or advisor of the Antigua Public Utilities Authority, a public utility or a public body shall not use or transmit information acquired in the course of their duties with respect to providing plans or permissions under this section in a way that would not disclose the intentions of an operator and shall treat any such information as confidential. (9) Prior to carrying out road works, a licensee shall publish a description of the works in at least one newspaper in circulation in the area where the road works are to be carried out and shall otherwise inform affected persons in such manner as the Commission may determine. 79. Access to crown lands. (1) Subject to subsection (2), an operator may, with the written permission of the Minister responsible for crown or public lands, enter any crown lands for the purpose of ― (a) inspecting the land to determine whether the land is suitable for the purposes of that operator; (b) installing a facility on the land; and (c) maintaining any facility situated on the land. (2) Before entering any crown or public lands for the purposes specified in subsection (1)(a) and (b) the operator shall, not later than 7 days before the date of the proposed entry, in writing notify the Minister referred to in subsection (1) of its intention to do so and such notice shall ―

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents