In support of this, comprehensive plans are being developed to guide the equipment and infrastructure project priorities across the White Paper based on the available funding envelope. Planning is also underway for the acquisition of a Multi-Role Vessel to replace the Naval Service flagship LÉ Eithne, and a Mid-Life Extension Programme of the Naval Service’s two P50 class vessels has commenced. Following a tender competition, a preferred bidder has recently been identified, and contract negotiations are ongoing, for the replacement of the Air Corps’ two CASA Maritime Patrol Aircraft. Meanwhile, over €30m has been invested on a range of infrastructure projects across all formations since 2016. However, recognising that investment had been constrained, there is continuing scope to enhance investment in military facilities. Currently, some €37m worth of infrastructure development projects are at various stages of implementation. These projects include the upgrade and modernisation of Army, Air Corps and Naval Service facilities. In January 2020, a focussed five year infrastructure programme, utilising the investment provided for in Project Ireland 2040, will be launched. While these equipment and infrastructure projects are all positive developments in their own right, and are reflective of ongoing collaboration between civil and military personnel within the Department of Defence, and with the various military formations, this Update nevertheless points to the continuing potential for additional investment in capital projects. Present funding levels result in major equipment platforms being replaced only sequentially, or over extended periods of acquisition. It remains the case that a range of equipment requirements identified in the White Paper cannot be advanced for some time or will await additional investment becoming available. Thus, for the present, these requirements fall outside what can be prioritised within existing budgets. Meanwhile, demands on capability, which continue to become more sophisticated and dynamic, along with the need to take account of climate change objectives, all point to continuing enhanced investment requirements. 5

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents