Bhutan e-Government Master Plan
3.6.4
National ICT Infrastructure and Services
Bhutan
strives to achieve
sustainable
socio economic
development
through
many
ways, one of which is to promote growth of IT and IT enabled sector for revenue and
employment
generation.
with risk management
Reliable
ICT infrastructures
including telecom
redundancy
arrangement are paramount to attracting ICT investment and
taking the sector forward.
International Telecom
Bhutan
from
Gateway
via Bangladesh
has two international gateways today; one from
Gelephu.
However,
all
the
fiber
cables
Phuntsholing
providing
these
and the other
connections
pass
through a narrow strip of land, the so called “chicken neck” (single point of failure), in
Siliguri.
This
poses
a risk to Bhutan’s
international
connectivity
being
affected
by
incidents (natural calamities etc) in Siliguri.
As a consequence,
the overall
addition
additional redundancy avoiding the “chicken neck” is desired for
reliability and
the requirement
opportunities
important
which
sector
gateway
the
for
full redundancy
of Bhutan’s
is vital for Bhutan’s
Government
revenue
will benefit Bhutan
and
has
international
aspiration
already
employment
connectivity.
to engage
identified
generation.
in terms of attracting foreign
and
The
in IT and
embraced
In
ITES
as
an
2™
international
investments
in the sector
and in particularto the ITPark. In the long run, it will enhance and promote Bhutan as
IT/ITES
business
hub, which
in turn will contribute to the country’s socio-economic
growth.
Therefore,
an
international
alternate
submarine
international
cable
connectivity
landing,
through
is proposed.
The
Bangladesh,
connection
which
has
will be either
from Gelephu or Samdrup Jongkhar on the Bhutanese side through Tripura in India,
to finally Cox Bazaar in Bangladesh.
The
establishment
of this gateway
will be carried
out by the Telcos
and
Internet
service Providers (ISPs). DITT/MoIC will facilitate in terms of securing administrative
approvals
of
the
Government
of
India
and
the
Government
of
Bangladesh.
DITT/MoIC will also facilitate to establish missing fiber links at the border crossings,
and in other ways to realize this objective. The overall cost estimate is Nu. 20 m and
the work will be carried out from
2014.
July 2013
and
expectedto
be completed
by July