combat enabling air campaigns
involve the use of an attack helicopter, or unarmed helicopter along with
attack helicopters to provide covering fire, or even an armed helicopter
with fighter escorts. Such operations may prove to be costly, especially if
the enemy is aware of where the aircraft has crashed and deploys air and
surface forces in that area. Hence, combat search and rescue operations
should only be undertaken, if, the prospects of success are good and if
surprise can be maintained. The depth of penetration would depend on
enemy defences in that area. Further, armed helicopter escorts should
take into account their own vulnerability as regards the enemy’s AD
systems.
Imperatives for Successful Execution of CSAR. CSAR is a specialised
operation. The main factor for success in CSAR operations is quick
response. Thus as soon as the aircrew ejects, his position must be quickly,
and as far as possible, accurately relayed to the nearest CSAR base; the
base must be located close to the border; the crew must be close to the
aircraft; and the rescue beacon available with the pilot must be able to
accurately indicate his location. The other contributory factors include
accurate intelligence, secure communications, appropriate control over
air, AD, enemy surface forces in the area and the weather.
TESTING, EVALUATION, RESEARCH AND DEVELOPMENT
(R&D)
Technology and doctrine are dynamic processes and must necessarily
adapt to change lest they become obsolete and lose their relevance.
Self reliance in testing and flight evaluation ensures that new weapon
systems acquired by the country meet the requirements of the IAF.
The Aircraft and Systems Testing Establishment (ASTE) is the nodal
agency for testing and evaluation activities in the IAF. Its activities
support the acquisition, modification, upgradation, and maintenance
of weapon systems and equipment. ASTE ensures that aircraft and
equipment meet the requirement of peace and war time. It undertakes:
evaluation of aircraft and equipment at the prototype stage; the
evaluation and service trials of new aircraft and airborne equipment
95
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents