Ministry of Defense Central Administration In the Deployment and Equipment Plan, the Central Administration of the Defense Ministry directly manages six projects. Of these, four are allocated to the Joint Staff and two to the Center for the Management and Operation of the Amazon Protection System. The projects are as follows: • Military Communication System by Satellite (SISCOMIS); • Secure Military Communication System (SISTED); • Development of the Defense Logistics and Mobilization System (SISLOGD); • Modernization of Air Defense and the Defense of Strategic Structures69; • Modernization of the Amazon Protection System; and • Amazon Cartography. CHAPTER 5 — DEFENSE TRANSFORMATION Positive Effects of the PAED’s Implementation When the projects inserted in the Deployment and Equipment Plan are completed, the country will be more prepared to face challenges to national defense. Projects in this Plan will benefit the Brazilian society and the Defense Industrial Base in various ways. Some identified gains are listed below: 1. In the military field • Elevation of the country’s dissuasive power and consequent avoidance of hostile actions by other states; • Greater possibility for cooperation with neighboring Armed Forces; and • Contribution to the prevention and fight against new threats, as well as the fight against drug trafficking, gun smuggling, border transgressions and organized crime. The Modernization of Air Defense and the Defense of Strategic Structures project includes the following sub-projects: Modernization of the Air Defense and Coastal Artillery School and the Air Defense of Strategic Structures. The project differs from the Army’s Air Defense System project, which aims to supply anti-aircraft defense to military units in a Combat Zone (ZC) in a Theater of Operations (TO). 69 210 DEFENSE WHITE PAPER

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents