5) it was provided for in the development projects of the electronic communications infrastructure and/or suitable purpose physical infrastructure approved by the infrastructure manager to carry out the development of electronic communications infrastructure and/or suitable purpose physical infrastructure within the coming 24 months (for example, to lay electronic communication lines, install apparatuses and equipment, other electronic communications infrastructure, and/or suitable purpose physical infrastructure), whereas sharing of the existing electronic communications infrastructure and/or suitable purpose physical infrastructure, and/or the electronic communications infrastructure installed by the infrastructure user will impede the implementation of these projects; 6) installation of the electronic communications infrastructure would cause unacceptable impediments to operating the existing electronic communications infrastructure and/or suitable purpose physical infrastructure, or the previously installed electronic communications infrastructure that was set up by sharing this electronic communications infrastructure and/or suitable purpose physical infrastructure; 7) the existing electronic communications infrastructure and/or suitable purpose physical infrastructure requested to be shared is not suitable for implementing the goals of shared usage of the existing electronic communications infrastructure and/or suitable purpose physical infrastructure indicated by the infrastructure user (for example, laying of electronic communications lines, apparatuses, equipment, or installing other electronic communications infrastructure). 4. The procedure and conditions of sharing the specific existing electronic communications infrastructure and/or suitable purpose physical infrastructure, also the procedure and conditions of installing the electronic communications infrastructure are established in the contract on the sharing of infrastructure in accordance with the rules laid down in paragraph 7 of this Article. The infrastructure manager may not request that the contract on the sharing of infrastructure concluded in accordance with paragraph 2 of this Article should be amended or terminated if contractual obligations are being fulfilled. 5. By agreement of the parties, the infrastructure user shall pay the infrastructure manager a fee for the usage of the electronic communications infrastructure and/or suitable purpose physical infrastructure. The Communications Regulatory Authority, when solving a dispute between the infrastructure user and the infrastructure manager, has the right to determine the amount of the fee for the usage of the electronic communications infrastructure and/or suitable purpose physical infrastructure. If there is an economic justification, the infrastructure manager has the right to review the amount of the fee, but 71

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents