machinery, plant and process equipment according to Article 160 (1) and (2) of the Spatial Development
Act.
(3) Control over the design, construction and commissioning of the projects referred to in
Paragraph (1) shall be implemented under the terms and according to the procedure established by the
Spatial Development Act.
(4) The time limit for approval of a development-project design, including an integrated
development-project initiative design, and for the issuance of a building permit for public electronic
communications networks, facilities and the related infrastructure shall be set according to the Spatial
Development Act but may not be longer than six months reckoned from the date of submission of a
development-project intention by the undertaking providing public electronic communications networks
and/or facilities.
(5) A duly submitted application for the granting of rights to install facilities and the related
infrastructure of the public electronic communications networks shall be considered by the competent
authority within one month after submission of the application.
(6) Upon exercise of powers of the municipal authorities in connection with the design,
establishment, commissioning and maintenance of electronic communications networks and facilities,
the said authorities may not set additional requirements which are not in conformity with this Act, the
Spatial Development Act or with other special law or instruments of subordinate legislation on the
application thereof.
(7) Electronic communications networks, facilities and the related infrastructure in a co-owned
building or in common parts of a condominium-project building shall be established on the basis of a
contract in writing and the consent of the owners owing at least one-half of the property in the building.
Section II
(New, SG No. 105/2011, effective 29.12.2011)
Right of Way. Co-location and Shared Use
Article 281a. (New, SG No. 105/2011, effective 29.12.2011) (1) The undertakings providing
public electronic communications networks and/or services shall have a right to establish electronic
communications facilities and the related infrastructure after conclusion of a written contract with the
owner on, over or under corporeal immovables constituting:
1. public or private state property;
2. public or private municipal property;
3. private property of natural or legal persons.
(2) The undertakings implementing electronic communications for private needs shall have a right
to establish electronic communications facilities and the related infrastructure after conclusion of a
written contract with the owner on, over or under corporeal immovables constituting:
1. public state property;
2. public municipal property;
3. private property of natural or legal persons.
Article 281b. (New, SG No. 105/2011, effective 29.12.2011) (1) The Commission, respecting the
principle of proportionality, may impose on the undertakings providing public electronic
communications networks and/or services co-location and/or shared use of electronic communications
infrastructure facilities, including in buildings, common premises in buildings or building access points,
electricity distribution networks, building electric wiring systems, cabling inside building and up to the
first concentration or distribution point in case this is located outside the building, masts, antennae,
towers and other supporting constructions or bearing structures, ducts, cabinets, distribution frames on,
over or under the immovables covered under Article 281a (1) herein.
(2) The obligation referred to in Paragraph (1) may be imposed on considerations related to