construction work or take other action completely or in part, provided this does not defeat the
purpose of an appeal (right to commence). In other regards, the provisions of section 144 of
the Land Use and Building Act (132/1999) apply to the right to commence.
Section 234
Requirements for the placement
A telecommunications cable, radio mast and base station may not be located in conflict with
a land-use plan and must not hinder the implementation of existing regional land use plans or
local master plans. The placement shall not complicate drawing up land use plans.
The placement of a telecommunications cable, radio mast and base station serving public
telecommunication connections referred to in section 229(1) requires that the placement
cannot be organised satisfactorily by some other means and at reasonable cost. Causing undue
harm to the property or building shall be avoided when a decision concerning the placement is
made. The placement and maintenance of a telecommunications cable, radio mast or base
station and the related equipment shall not cause hindrance or damage to the use of the real
estate and building that could be avoided at reasonable expense.
Wherever possible, a telecommunications cable shall be placed in a highway area referred to
in the Highways Act (503/2005) or in a public area referred to in the Act on Real Estate
Formation (554/1995).
Section 235
Amendment or removal of an action permit
An action permit based on a decision referred to in section 233(1) may be amended or
removed by decision of a municipal building supervision authority if agreed to by the parties.
An action permit may be amended or removed by municipal building supervision authority
decision without a telecommunications operator’s consent if:
1) the action permit has become unnecessary due to a change in circumstances or has lost a
substantial part of its significance;
2) the burden caused by the action permit has become unreasonable for the property or
building concerned and amendment or removal of the permit will not cause substantial harm
to the permit holder; or
3) the action permit substantially hinders implementation of the local land use plan.
The right to commence referred to in section 233 applies to the decision by a municipal
building supervision authority referred to in subsection 2.
Section 236
A right related to action permit to undertake construction and maintenance work in an area or
building belonging to another
If it is necessary for the placement of a telecommunications cable or radio mast, a
telecommunications operator with a right based on a decision under section 233(1) may,
without the permission of the owner or holder, fell trees and remove other plants from the
placement plan area, affix necessary equipment to buildings and structures and undertake
other construction work in the area. For this purpose, anyone in the service of the
telecommunications operator or the operator’s subcontractor has the right to access a private
area and affix the necessary markings on the ground.