6.6 Monitoring and implementation
6.6.1 National Plan Implementation
The MIT will initiate the implementation of measures to remove barriers for the planning and
construction of electronic communications networks consistently with the objectives identified
in the National Plan, together with the public authorities listed in chapter 10.1 and
professional associations, in particular the umbrella associations of operators of electronic
communications networks or other relevant bodies. The process of implementation of each
measure (especially those adduced in chapter 6.2 of the National Plan) and its timeframe will
be specified in an action plan to be presented to the Government by 31 March 2017. While
drawing up the action plan, new measures, not mentioned in the National Plan, may be
added based on the discussion with relevant bodies.
The action plan will include an overview of individual measures to remove the barriers for
planning and construction of electronic communications networks, especially those adduced
in chapter 6.2 of the National Plan, and a proposal for their implementation. The Plan will
also appoint the lead manager, including potential cooperation, and set the timeframe for the
implementation of the measures.
MIT shall present to the Government, on a yearly basis, a report on activities conducted in
order to achieve the objectives set by the National Plan, including the implementation of the
Plan.
6.6.2 Monitoring the implementation of public support
Responsibility for the systematic and continuous monitoring of the subsidy mechanism in the
area of public support for the building of NGAs is borne by the MIT as the OP EIC Managing
Authority. It will closely cooperate with the Agency for Enterprise and Innovation and with the
CTO, which will annually update the information and will identify the BSUs that could receive
this support regularly for the MIT once a year after the completion of the collection and
verification of statistical data. For this reason, the CTO has introduced regular annual
updating of the existence of NGAs, including the collection of data and the creation of maps
showing the state of completion of NGAs by the private sector with an outlook for the coming
three years.
The starting point for setting up the OP EIC monitoring system is the intervention logic of the
programme, which - based on a situation analysis and the identification of problems/needs
and their causes - will define the strategy of the programme and define the individual specific
objectives. For the purpose of OP EIC monitoring an integrated set of indicators (common
and specific) has been proposed that are mutually logically interrelated. As part of the
monitoring of the programme, the Managing Authority will monitor whether the relevant
activities/measures are implemented and whether the implementation of the programme is in
accordance with expectations. At the same time, the values of the result indicators will be
monitored and also whether they are moving in the desired direction (falling or rising). The
main tool for OP EIC monitoring will be the unified information monitoring system, and
progress in the implementation of the programme will be regularly reported through annual
reports on OP EIC implementation, which will also include the development of the values of
the indicators. An assessment of the state of OP EIC implementation and its financial and
material progress will be the subject of regular meetings of the OP EIC Monitoring
Committee.