6.7 Public sources of funding for NGAs Experience from previous building of NGAs in the Czech Republic, confirmed by findings from abroad, show that this is a very financially demanding activity. The establishment of new networks made up in part or in whole of optical cables for high-speed Internet access enabling the determined transfer speed, i.e. 30 Mbit/s respectively 100 Mbit/s, as well as the modernisation and expansion of existing infrastructure and the building of so-called passive infrastructure require high investment from the contractor. According to available data, excavation work accounts for the largest costs, while more funds must be invested in the building of the actual connections for households, project preparation and documentation, the resolution of ownership, easements, linkages with other infrastructure etc. It is clear that in this connection a private investor must assess the return on the invested funds. From the nature of things, this is very low in particular in sparsely populated rural areas. We cannot therefore anticipate that the objectives presented above will be met only through the operation of market forces without further intervention. To achieve the objectives determined in the Digital Agenda for Europe document and in connection with it also in the State Policy in Electronic Communications “Digital Czech Republic 2.0 – The Way to the Digital Economy” it is therefore essential to diversify the necessary funds and - alongside private investments – also support the construction of NGNs from public funds, both European and national. One of the European sources considered was the so-called “Connecting Europe Facility” (CEF) defining the rules for the financing and implementation of European projects in energy, transport and telecommunications networks. During negotiations on the EU budget, however, the originally proposed funds for the telecommunications part of the CEF were reduced from EUR 9.2 billion to EUR 1 billion for projects throughout the EU. With regard to the amount of funds and the number of states in the EU and their size, we can anticipate that this tool will not be used in the Czech Republic. The primary source of European funds will therefore be the allocation from the European Regional Development Fund in the EU Cohesion Policy programming period 2014-2020 to the Operational Programme Enterprise and Innovation for Competitiveness 2014-2020. Within the framework of the total amount of funds allocated for OP EIC, i.e. EUR 4,316,062,617, the amount EUR 743,657,589 has been approved for priority axis 4, of which EUR 521,380,364, i.e. approximately CZK 14 billion, for the actual specific objective 4.1 “Increase Broadband Internet Access Coverage”. Funds from the so-called auction of frequencies were considered as a national source of funding for the development of NGAs. Through Government Resolution of 23 May 2012 No 370 the Government took note of the ongoing information about the current state of progress in the management of selected parts of the radio spectrum with a view to supporting the provision of high-speed Internet access services in the period until 2012, and charged the Minister of Industry and Trade in cooperation with the Chairman of the Council Czech Telecommunication Office to ensure the drafting of a programme of support for projects aimed at building NGAs, and the conditions for its management and funding, including an analysis of the possibility of using part of the revenues from the auction of frequencies to finance this programme. A final amount of CZK 8.5295 billion was obtained through the auction to allocate radio frequencies in the 800 MHz, 1800 MHz and 2600 MHz bands, which ended at the start of 2014, which after the payment of allocations became revenue for the 51

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents